Bus Shelter Install Notes ========================= DHD20160209 Refresh of GSM and LoRa module batteries, install of new GSM module. Also, test of access to seat void. Installation crew: Damon HD & Deniz E. Sensors: 1) 8aad GSM (temporary, battery refresh) 2) e0dd GSM (temporary, installed) 3) b9f9 LoRa (battery refresh) Locations are recorded elsewhere, by ID and install date. All eaves panels installs/maintenance, none plain eaves panels. Observations during install: * (1) Hook-and-eye stick seems unreliable. * (2) Loose bolts in eaves panel. * (2) Had to power-cycle (GSM) unit to start reliable transmission. * (2) Gained access to seat void in same shelter; should be fine for REV14s. * (3) Hook-and-eye stick is unreliable. * (3) Have put long-life alkalines in (note: achieved 10+ days runtime).